Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 1

CASHEW APPLE PROCESSING PROJECT

32000 0 32000 Before detailed project
PILIER 1

LOCAL AND INDUSTRIAL PADDY RICE PROCESSING PROJECT

5477 0 5477 Before detailed project
PILIER 1

INTEGRATED PROJECT FOR THE DEVELOPMENT OF THE MANGO INDUSTRY IN COTE D’IVOIRE

43000 0 43000 Before detailed project
PILIER 1

SHEA VALORIZATION AND TRANSFORMATION PROJECT IN COTE D’IVOIRE

10000 0 10000 Before detailed project

CRAFT

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 1

DIGITAL PLATFORM FOR THE DEVELOPMENT AND PROMOTION OF CRAFTS (PNDPA)

81780 0 81780 Project idea

TRADE

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 1

Résultats de traduction EXPLOITATION OF THE CENTRAL MARKET OF BOUAKÉ

35000 0 35000 Project idea

INDUSTRY

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 1

AMENAGER UNE ZONE INDUSTRIELLE À BONOUA (328 HA)

26351 0 26351 APS
PILIER 1

AMENAGER UNE ZONE INDUSTRIELLE À YAMOUSSOUKRO (250 HA)

66279 4359 61920 APD
PILIER 1

AMENAGEMENT DE LA ZONE INDUSTRIELLE DE SAN-PEDRO (ZI EXISTANTES ET RESERVES INDUSTRIELLES)

100000 0 100000 APS

ANIMAL AND FISH RESOURCES

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 1

PROJET DE CONSTRUCTION DE 50 ABATTOIRS MODERNES REGIONAUX

50000 0 50000 Project idea
PILIER 1

CONSTRUCTION ET EXPLOITATION DU COMPLEXE ABATTOIR-MARCHE À BETAIL D’ABIDJAN - ANYAMA (CAMA)

27000 0 27000 Project idea
PILIER 1

PROGRAMME NATIONAL DE DEVELOPPEMENT DU BIO DIGESTEUR EN CÔTE D'IVOIRE

3250 0 3250 Project idea

DIGITAL ECONOMY

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 3

EXPLOITATION DE 7 000 KM DU RÉSEAU NATIONAL HAUT DÉBIT DE CÔTE D'IVOIRE (RNHD)

50000 0 50000 Project idea

ENERGY AND RENEWABLE ENERGIES

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 3

CONSTRUCTION DE LA CENTRALE HYDROELECTRIQUE DE DABOITIE

228000 0 228000 Project idea
PILIER 3

CONSTRUCTION DE LA CENTRALE HYDROELECTRIQUE DE TIBOTO

465000 0 465000 Project idea
PILIER 3

CONSTRUCTION DU BARRAGE DE TIASSALE (51 MW)

95000 0 95000 Project idea
PILIER 3

CONSTRUCTION DE POSTE SOURCES DANS LE GRAND ABIDJAN

33000 0 33000 Project idea
PILIER 3

CONSTRUCTION DE POSTES SOURCES DANS L’OUEST DE LA COTE D’IVOIRE

55200 0 55200 Project idea
PILIER 3

CONSTRUCTION DE POSTES SOURCES DANS L’EST DE LA CÔTE D’IVOIRE

33000 0 33000 Project idea
PILIER 3

CONSTRUCTION DE POSTES SOURCES DANS LE NORD DE LA CÔTE D’IVOIRE

340800 0 340800 Project idea
PILIER 3

CONSTRUCTION DE POSTES SOURCES DANS LE SUD DE LA CÔTE D’IVOIRE

291000 0 291000 Project idea
PILIER 3

DEVELOPPEMENT DES RESEAUX DE DISTRIBUTION ET ACCES A L’ELECTRICITE

1281000 0 1281000 Project idea
PILIER 3

PRODUCTION D’ÉNERGIE ÉLECTRIQUE

2165 0 2165 Project idea
PILIER 3

RENFORCEMENT DU SYSTEME DE TELECONDUITE DU RESEAU ELECTRIQUE DE LA COTE D’IVOIRE

33000 0 33000 Project idea
PILIER 3

PROMOTION DE L’ACCES DES RESEAUX INTELLIGENTS ET DE L'ENERGIE SOLAIRE (PARIS)

72235 715 71520 New project

PROMOTION OF SMALL AND MIDSIZE BUSINESS (SMB)

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 3

MISE EN PLACE DE LA FILIERE ECONOMIQUE ET SOCIALE DU SPORT

7062 0 7062 Project idea

TRANSPORT

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 3

REALISER LE PROJET BARGING TRANSPORT DE MARCHANDISES PAR VOIES LAGUNAIRE (PAA)

100000 0 100000 Preliminary studies
PILIER 3

CONSTRUIRE UNE ROCADE PAA-JACQUEVILLE

90000 0 90000 Preliminary studies
PILIER 3

CONSTRUITRE LA VOIE DE FRANCHISSEMENT DU CANAL DE VRIDI PAR UN TUNNEL 3X4

49153 0 49153 Preliminary studies
PILIER 3

CONSTRUIRE UN BRT SUR LA ROUTE DU ZOO 8 KM

49153 0 49153 Project idea
PILIER 3

CONSTRUIRE UN BRT ABIDJAN BASSAM 11 KM

70476 0 70476 Project idea
PILIER 3

CONSTRUIRE UN BRT BVD ALLASSANE OUATTARA 5 KM

30450 0 30450 APS APD studies
PILIER 3

CONSTRUIRE LE CHEMIN DE FER MAN-SAN PEDRO-ODIENNE-FRONTIERE MALI

872000 0 872000 Project idea
PILIER 3

CONSTRUIRE LE CHEMIN DE FER OUANGOLODOUGOU NIELLE SIKASSO (ETUDES)

123000 0 123000 Project idea
PILIER 3

CONSTRUIRE LE CHEMIN DE FER ABIDJAN-SAN PEDRO-TABOU (ETUDES ET DEMARRAGE)

308000 0 308000 Project idea
PILIER 3

CONSTRUIRE LA GARE ROUTIERE INTERURBAINE D'ABIDJAN

47000 0 47000 APS APD studies
PILIER 3

CONSTRUIRE LA GARE INTERNATIONALE DE FRET D'ABIDJAN

200000 0 200000 Project idea
PILIER 3

CONSTRUIRE ET EXPLOITER UN TERMINAL À CONTENEURS AU PORT SAN PEDRO

414000 0 414000 Project idea
PILIER 3

CONSTRUIRE ET EXPLOITER UN TERMINAL MINERALIER RELIE À LA LIGNE DE CHEMIN DE FER MAN-SAN PEDRO

500000 0 500000 Project idea
PILIER 3

CONSTRUIRE LE NOUVEL AEROPORT INTERNATIONAL DE SAN PEDRO ET SON AEROCITE

80000 0 80000 Project idea

SANITATION AND SALUBRITY

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 4

MODERNISATION ET GESTION INTERCOMMUNALE DES DECHETS SOLIDES DES VILLES DE DALOA, GONATE, BONON, BOUAFLE

25257 0 25257 Project idea
PILIER 4

MODERNISATION ET GESTION INTERCOMMUNALE DES DÉCHETS SOLIDES - TOUMODI, YAMOUSSOUKRO, TIEBISSOU, DJEBONOUA ET BOUAKÉ

27628 0 27628 Project idea
PILIER 4

MODERNISATION ET GESTION INTERCOMMUNALE DES DÉCHETS SOLIDES - KORHOGO, SINÉMATIALI, FERKESSÉDOUGOU ET OUANGOLODOUGOU

12299 0 12299 Project idea
PILIER 4

OPTIMISATION DE LA COLLECTE, DU TRANSPORT, DU TRAITEMENT ET DE LA VALORISATION DES DSMA DANS LE DISTRICT D'ABIDJAN

27553 0 27553 Project idea

SPORT

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 4

CONSTRUIRE LA CITE OLYMPIQUE D'ANYAMA EBIMPE

1500000 0 1500000 Project idea
PILIER 4

REHABILITER ET DE CONSTRUIRE DE 194 D'INFRASTRUCTURES SPORTIVES (15 STADES REGIONAUX, 28 STADES DE TYPE 1, 48 STADES DE TYPE 2, 103 STADES DE TYPE 3)DANS LE CADRE DU PRECIS SPECIAL

71230 0 71230 Project idea

URBAN PLANNING AND HOUSING

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 4

CONSTRUCTION DE TROIS (5) TOURS ADMINISTRATIVES À ABIDJAN PLATEAU POUR LE COMPTE DE L'ETAT DE CÔTE D'IVOIRE (PPP)

690000 0 690000 Project idea
PILIER 4

CONSTRUIRE LE COMPLEXE « PLACE DE LA NATION » (PPP)

87000 0 87000 Project idea
PILIER 4

CONSTRUCTION D'UN HÔTEL CINQ ETOILES SUR LE SITE DE L'AIP (PPP)

60000 0 60000 Project idea
PILIER 4

REHABILITATION DE L'IMMEUBLE PYRAMIDE (PPP)

30000 0 30000 Project idea
PILIER 4

PRODUCTION DE TERRAINS AMÉNAGÉS MINISTÈRE DE LA CONSTRUCTION/SECTEUR PRIVÉ

109000 0 109000 Project idea
PILIER 4

REHABILITATION ET EXPLOITATION DE L’IMMEUBLE BICICI

21000 0 21000 Project idea

WATERS AND FORESTS

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 5

MISE EN ŒUVRE DES CAFAD ET REBOISEMENT EN PPP

169992 0 169992 Project idea
PILIER 5

PROJET DE CREATION D’UNE FORÊT PERI-URBAINE ET D’UN MINI PARC ZOOLOGIQUE DANS LE DISTRICT DE YAMOUSSOUKRO

20000 0 20000 Project idea
PILIER 5

PROJET DE DÉVELOPPEMENT DU JARDIN BOTANIQUE DE BINGERVILLE

2000 0 2000 Project idea

MINES

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 1

CONSTRUCTION DE L'INFRASTRUCTURE GEOLOGIQUE ET DU SYSTÈME GEO SCIENTIFIQUE (SIG)

8435 0 8435 Project idea

TOURISM

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 1

CRÉATION DE LA ZONE TOURISTIQUE DU STADE D’EBIMPÉ

64097 0 64097 Before detailed project
PILIER 1

VALORISATION TOURISTIQUE DU PARC NATIONAL PRIVÉ N’ZI RIVER LODGE

5741 0 5741 Before detailed project
PILIER 1

VALORISATION TOURISTIQUE DES PARCS NATIONAUX DE TAÏ ET DE LA COMOÉ

14513 0 14513 Fundraising

HYDROCARBONS

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 1

DEGOULOTTAGE DE LA LOGISTIQUE MER / TERRE

30000 0 30000 Project idea
PILIER 1

DEGOULOTTAGE DE LA CAPACITE DE REFORMING CATALYTIQUE DE LA SIR U83

60000 0 60000 Project idea
PILIER 1

DEGOULOTTAGE DE LA DISTILLATION ATMOSPHERIQUE U81

30000 0 30000 Project idea
PILIER 1

INSTALLATION D’UNE CENTRALE DE COGENERATION D’ELECTRICITE ET DE VAPEUR

32000 0 32000 Project idea
PILIER 1

MISE AUX NORMES AFRI 4 DES CARBURANTS (HDS)

180000 0 180000 Project idea
PILIER 1

STOCKAGE MASSIF D’HYDROCABURES

497265 0 497265 Project idea

ENVIRONMENT AND SUSTAINABLE DEVELOPMENT

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 5

AMÉNAGEMENT ET VALORISATION TOURISTIQUE DU PARC NATIONAL DU BANCO

11900 0 11900 Project idea
PILIER 5

PROJET DE PROTECTION DE LA BIODIVERSITE DU PARC NATIONAL DE LA COMOE

13920 0 13920 Project idea

INTEGRATION

Projects cost are estimated in millions (XOF)

Piliers Intitulé Coût total Acquis A Rechercher Maturité
PILIER 6

CONSTRUCTION D'UNE USINE DE BIO-LARVICIDES EN CÔTE D'IVOIRE

15500 0 15500 Project idea